During the sales and operations planning (S&OP) process, which of the following tasks is the primary responsibility of the functional representatives on the supply planning team?
Answer(s): C
The supply planning team is responsible for developing a supply plan that balances the demand plan with the available resources and capacities. The functional representatives on the supply planning team, such as production, procurement, engineering, and finance, need to ensure that their functional objectives are considered when developing the plans. For example, production needs to consider the impact of the supply plan on the production schedule, capacity utilization, and labor requirements. Procurement needs to consider the impact of the supply plan on the supplier relationships, lead times, and inventory levels. Engineering needs to consider the impact of the supply plan on the product design, quality, and innovation. Finance needs to consider the impact of the supply plan on the costs, revenues, and profitability. By ensuring that the functional objectives are considered, the supply planning team can create a feasible and optimal supply plan that aligns with the overall business strategy.
1 S&OP: A Comprehensive Overview of Sales and Operations Planning 3 2 CPIM Exam Reference - Association for Supply Chain Management 1
An example of a cradle-to-cradle sustainability model would be:
Answer(s): B
A cradle-to-cradle sustainability model is a design concept that aims to create products that can be reused or recycled indefinitely, without generating any waste or pollution. It mimics the natural cycles of nature, where everything is a nutrient for something else. A cradle-to-cradle model differs from a cradle-to-grave model, which follows a linear path of production, consumption, and disposal. Option B is an example of a cradle-to-cradle model, because the paper waste from the coffee shop is collected and recycled by a supplier, who then provides new paper products to the coffee shop. This creates a closed loop of material flow, where nothing is wasted and the paper is continuously reused. Option A is not a cradle-to-cradle model, because the laundry service does not reuse or recycle the baby clothes. It only cleans and delivers them, but does not prevent them from eventually ending up in the landfill.Option C is not a cradle-to-cradle model, because the company does not ensure that the wood it uses is from sustainable sources, or that the products it makes can be easily disassembled and recycled. It also does not consider the environmental impacts of transporting the wood from different locations. Option D is not a cradle-to-cradle model, because the bank does not directly influence the design or production of the products that the firms use. It only provides financial incentives for them to adopt more sustainable practices, but does not guarantee that they will follow a cradle-to-cradle approach.
* Cradle-to-Cradle for Sustainable Development: From Ecodesign to Circular Economy * Cradle to Cradle Sustainability Guide
What priority control technique is most appropriate for a firm using a cellular production system?
A cellular production system is a type of lean manufacturing system that reduces waste and improves efficiency by grouping machines and workers into cells that can produce a complete product or a product family. A pull production activity control (PAC) technique is most appropriate for a cellular production system because it allows the cells to produce only what is needed by the downstream processes or customers, thus minimizing inventory and overproduction. A pull PAC technique also enables quick response to changes in demand and feedback from quality control. A push PAC technique, on the other hand, is based on predetermined schedules and forecasts, which may not match the actual demand and may result in excess inventory and waste. The shortest processing time(SPT) rule and the distribution requirements planning (DRP) are not specific to cellular production systems and do not take into account the customer demand or the cell capacity.
* CPIM Part 2 Exam Content Manual, p. 49* Cellular Manufacturing: A Comprehensive Guide* Cellular manufacturing - Wikipedia
Which of the following circumstances would cause a move from acceptance sampling to 100% inspection?
Acceptance sampling is a statistical quality control technique that involves inspecting a sample of products or materials from a lot and deciding whether to accept or reject the lot based on the sample results. Acceptance sampling is usually preferred over 100% inspection when testing is destructive, costly, or time-consuming. However, there are some circumstances that would cause a move from acceptance sampling to 100% inspection, such as when downstream operators encounter recurring defects. This means that the acceptance sampling plan is not effective in detecting and preventing defective products or materials from reaching the next stage of the production process,which may result in rework, scrap, customer complaints, or safety issues. In this case, 100% inspection may be necessary to ensure that every product or material meets the quality standards and specifications, and to identify and correct the root causes of the defects.
1 Acceptance sampling - Wikipedia 4 2 100% Inspection or Sampling Inspection? Which is Best. 3 CPIM Exam Reference - Association for Supply Chain Management 1
In pyramid forecasting, the "roll up" process begins with:
Answer(s): A
Pyramid forecasting is a method of forecasting that uses a hierarchical structure of data to improve the accuracy and consistency of the forecasts. The lowest level of the pyramid represents the most detailed data, such as individual product items, while the higher levels represent more aggregated data, such as product families or total business. The "roll up" process is the process of aggregating the forecasts from the lower level to the higher level, starting with the most detailed level. This process helps to align the forecasts across different levels and reduce the forecast error.
1: Pyramid Forecasting Process 2: Rolling Forecast Model | FP&A Tutorial + Excel Template3: ROLL-UP FORECASTS
Share your comments for APICS CPIM-8.0 exam with other users:
very useful
physical tempering techniques
its giving best technical knowledge
please upload
great question with explanation thanks!!
does this exam have lab sections?
please upload the braindump for .net
i need this exam 1z0-1107-2. please.
very useful!
for this question - "which three type of basic patient or member information is displayed on the patient info component? (choose three.)", list of conditions is not displayed (it is displayed in patient card, not patient info). so should be thumbnail of chatter photo
q52 should be d. vm storage controller bandwidth represents the amount of data (in terms of bandwidth) that a vms storage controller is using to read and write data to the storage fabric.
nice questions
question # 208: failure logs is not an example of operational metadata.
good questions
thank you for the test materials!
its very helpful
good questons
i need the dumb of the hcip security v4.0 exam
upload the dump please
yes, iam looking this
please upload cima e2 managing performance dumps
wonderful questions
i used this site since 2000, still great to support my career
why is the answer to "which of the following is required by scrum?" all of the following stated below since most of them are not mandatory? sprint retrospective. members must be stand up at the daily scrum. sprint burndown chart. release planning.
great job. hope this helps out.
upload please. many thanks!
this is so interesting
great material thanks
anyone who wrote this exam recently
ok they re good
relevant questions
Keeping this site free takes real effort. We constantly battle automated scraping and unauthorized content copying. A quick account helps us protect the community and keep the site free.
To continue studying for your CPIM-8.0, please sign in or create a free account.