What defines a sub-panel?

  1. An enclosure consisting of buss-bars and circuit breakers located at the service entrance to a building
  2. An enclosure consisting of buss-bars and circuit breakers with the fundamental purpose of distributing power to receptacles and the load
  3. An enclosure consisting of buss-bars and circuit breakers designed to accept two sources of power and operate as a best source selector
  4. An enclosure consisting of buss-bars and draw-out circuit breakers with the fundamental purpose of distributing power to branch distribution panels

Answer(s): B



What are three components of power distribution? (Choose three.)

  1. Flexible conduit
  2. Circuit / branch circuit
  3. Automatic Transfer Switch (ATS)
  4. Uninterruptible Power Supply (UPS)
  5. Ground Loop

Answer(s): B,C,D



Which statement is a recognized characteristic of single-phase power?

  1. Single-phase power excludes the use of three-phase power in the data center.
  2. Single-phase power provides an effective means for delivering DC power to the data center.
  3. Single-phase power is an effective choice of power supply when data center users require large volumes of power.
  4. Single-phase power implies that power comes into the data center with one "hot" wire, along with accompanying neutral and ground.

Answer(s): D



Which statement illustrates a characteristic of nominal voltage?

  1. Nominal voltage is the voltage reference published by the power company.
  2. In most geographies, nominal voltage is fixed at either 380 V or 460 V.
  3. Nominal voltage is calculated based upon the load characteristics of the end user.
  4. Nominal voltage is the voltage that is supplied to the building and factors in power distribution losses.

Answer(s): A



Which power distribution component is closest to the data center IT load?

  1. Switchgear
  2. Wet cell battery
  3. Diesel generator
  4. Uninterruptible power supply

Answer(s): D



Share your comments for APC DU0-001 exam with other users:

A
Ashok Kumar
1/2/2024 6:53:00 AM

the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.

M
Merry
7/30/2023 6:57:00 AM

good questions

V
VoiceofMidnight
12/17/2023 4:07:00 PM

Delayed the exam until December 29th.

U
Umar Ali
8/29/2023 2:59:00 PM

A and D are True

V
vel
8/28/2023 9:17:09 AM

good one with explanation

G
Gurdeep
1/18/2024 4:00:15 PM

This is one of the most useful study guides I have ever used.

AI Tutor 👋 I’m here to help!