You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible.
Which settings do you make to achieve this?

  1. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
  2. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  3. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  4. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.

Answer(s): D



You want to perform capacity availability checks on your production orders. What must be

set for this to occur?
Note: There are 2 correct answers to this question.

  1. Checking control must have an overall profile assigned in customizing.
  2. Indicator Relevant for finite scheduling must be set.
  3. Checking rule and group must be assigned.
  4. PRT Availability check must be set.

Answer(s): A,B



What does it mean for the production planner when MRP works with infinite capacities?

  1. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  2. MRP creates capacity requirements without checking the capacity of a work center.
  3. MRP creates capacity requirements only if the work center has sufficient capacity.
  4. MRP assigns capacity requirements automatically after the last scheduled order on a work center.

Answer(s): B



In which data object is the production line (Repetitive manufacturing relevant work center) maintained?

  1. Production version
  2. Cost collector
  3. Bil1 of material
  4. Repetitive manufacturing profile

Answer(s): A



What is the difference between co-products and by-products?

  1. Only co-products can be manufactured in isolation from the main product.
  2. Only by-products have a zero inventory valuation.
  3. Only co-products are identified by a special item category in the bill of material (BOM).
  4. Only co-products appear in the process or production order settlement rule.

Answer(s): D



Viewing Page 5 of 31



Share your comments for SAP C_TS422_2020 exam with other users:

rsmyth 5/18/2023 12:44:00 PM

q40 the answer is not d, why are you giving incorrect answers? snapshot consolidation is used to merge the snapshot delta disk files to the vm base disk
IRELAND


Keny 6/23/2023 9:00:00 PM

thanks, very relevant
PERU


Muhammad Rawish Siddiqui 11/29/2023 12:14:00 PM

wrong answer. it is true not false.
SAUDI ARABIA


Josh 7/10/2023 1:54:00 PM

please i need the mo-100 questions
Anonymous


VINNY 6/2/2023 11:59:00 AM

very good use full
Anonymous


Andy 12/6/2023 5:56:00 AM

very valid questions
Anonymous


Mamo 8/12/2023 7:46:00 AM

will these question help me to clear pl-300 exam?
UNITED STATES


Marial Manyang 7/26/2023 10:13:00 AM

please provide me with these dumps questions. thanks
Anonymous


Amel Mhamdi 12/16/2022 10:10:00 AM

in the pdf downloaded is write google cloud database engineer i think that it isnt the correct exam
FRANCE


Angel 8/30/2023 10:58:00 PM

i think you have the answers wrong regarding question: "what are three core principles of web content accessibility guidelines (wcag)? answer: robust, operable, understandable
UNITED STATES


SH 5/16/2023 1:43:00 PM

these questions are not valid , they dont come for the exam now
UNITED STATES


sudhagar 9/6/2023 3:02:00 PM

question looks valid
UNITED STATES


Van 11/24/2023 4:02:00 AM

good for practice
Anonymous


Divya 8/2/2023 6:54:00 AM

need more q&a to go ahead
Anonymous


Rakesh 10/6/2023 3:06:00 AM

question 59 - a newly-created role is not assigned to any user, nor granted to any other role. answer is b https://docs.snowflake.com/en/user-guide/security-access-control-overview
Anonymous


Nik 11/10/2023 4:57:00 AM

just passed my exam today. i saw all of these questions in my text today. so i can confirm this is a valid dump.
HONG KONG


Deep 6/12/2023 7:22:00 AM

needed dumps
INDIA


tumz 1/16/2024 10:30:00 AM

very helpful
UNITED STATES


NRI 8/27/2023 10:05:00 AM

will post once the exam is finished
UNITED STATES


kent 11/3/2023 10:45:00 AM

relevant questions
Anonymous


Qasim 6/11/2022 9:43:00 AM

just clear exam on 10/06/2202 dumps is valid all questions are came same in dumps only 2 new questions total 46 questions 1 case study with 5 question no lab/simulation in my exam please check the answers best of luck
Anonymous


Cath 10/10/2023 10:09:00 AM

q.112 - correct answer is c - the event registry is a module that provides event definitions. answer a - not correct as it is the definition of event log
VIET NAM


Shiji 10/15/2023 1:31:00 PM

good and useful.
INDIA


Ade 6/25/2023 1:14:00 PM

good questions
Anonymous


Praveen P 11/8/2023 5:18:00 AM

good content
UNITED STATES


Anastasiia 12/28/2023 9:06:00 AM

totally not correct answers. 21. you have one gcp account running in your default region and zone and another account running in a non-default region and zone. you want to start a new compute engine instance in these two google cloud platform accounts using the command line interface. what should you do? correct: create two configurations using gcloud config configurations create [name]. run gcloud config configurations activate [name] to switch between accounts when running the commands to start the compute engine instances.
Anonymous


Priyanka 7/24/2023 2:26:00 AM

kindly upload the dumps
Anonymous


Nabeel 7/25/2023 4:11:00 PM

still learning
Anonymous


gure 7/26/2023 5:10:00 PM

excellent way to learn
UNITED STATES


ciken 8/24/2023 2:55:00 PM

help so much
Anonymous


Biswa 11/20/2023 9:28:00 AM

understand sql col.
Anonymous


Saint Pierre 10/24/2023 6:21:00 AM

i would give 5 stars to this website as i studied for az-800 exam from here. it has all the relevant material available for preparation. i got 890/1000 on the test.
Anonymous


Rose 7/24/2023 2:16:00 PM

this is nice.
Anonymous


anon 10/15/2023 12:21:00 PM

q55- the ridac workflow can be modified using flow designer, correct answer is d not a