Before leaving the site after an install, who is required to provide completion sign-off?
Answer(s): B
The customer's completion sign-off is required to confirm that the installation meets their expectations and requirements before the engineer leaves the site.
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?
Running cobalt_check.py on a new //XR4 array verifies hardware and system readiness before executing puresetup newarray, ensuring a smooth setup process.
A customer has a FlashArray X20R3 with 22/22 data packs in the chassis at 80% space usage and wishes to swap one of the data packs for a 45TB pack. What step needs to be taken to facilitate this consolidation?
Adding a DirectFlash Shelf with sufficient temporary extra capacity (63TB) allows data to be evacuated from the smaller 22TB packs during the swap, enabling consolidation without reducing array usage beforehand.
An Implementation Engineer is onsite to install a new DFM data pack (DP) to CH0.BAY10-CH0.BAY19 of a FlashArray.After adding the drives to the chassis, which command should the Implementation Engineer run to verify if the new DP is in a wide write group?
Answer(s): C
The puredrive list --pack command shows detailed information about the specified data pack, including whether its drives are part of a wide write group.
What is the rack unit height of a FlashArray//XR2/3?
Answer(s): A
The FlashArray//XR2 and //XR3 models each occupy 3 rack units (RU) in height. This is specified in the FlashArray//XR2 and //XR3 Site Planning Guide, which outlines the physical requirements for rack space, clearance, and weight for these models.
An Implementation Engineer is beginning a controller upgrade. Which command should be run to stop Purity?
The command pureadm stop --controller CT0 specifically stops Purity on the designated controller (CT0), which is the correct step to safely begin a controller upgrade.
When transforming an array from SAS to NVMe with the Evergeen XFORM upgrade, when should a swing shelf be installed?
A swing shelf is installed during the SAS to NVMe Evergreen XFORM upgrade only if the array lacks enough free capacity to evacuate data packs, enabling safe data migration during transformation.
The Customer's Implementation Workbook specifies that the SMTP reply is "outlook.microsoft.com:587". What correction should be made for array initialization to be successful?
For SMTP settings during array initialization, the host should be specified without the port number; including ":587" can cause connection issues and prevent successful initialization.
Share your comments for Pure Storage FlashArray Implementation Specialist exam with other users:
need it thx
good questions
good one nice revision
i love this thank you i need
question # 142: data governance is not one of the deliverables in the document and content management context diagram.
most answers not correct here
what % of questions do we get in the real exam?
i just want to tell you. i took my microsoft az-104 exam and passed it. your program was awesome. i especially liked your detailed questions and answers and practice tests that made me well-prepared for the exam. thanks to this website!!!
all the best
very usefull document
nice and helpful questions
i found the questions helpful
q 105 . ans is d
i have interest to get a sybase iq dba certification
want to pass exm.
are the answers correct?
good morning, could you please upload this exam again, i need it to test my knowledge in sd-wan with version 7.0.
very nice question
i have learning disability and this exam dumps allowed me to focus on the actual questions and not worry about notes and the those other study materials.
165 should be apt
please upload the dumps, real need of them
any recent feeedback?
question number 2 is indicating you are giving proper questions. observe and change properly.
passed today.40% questions were new.litwere case study,lots of new questions on afd,ratelimit,tm,lb,app gatway.got 2 set series of questions which are not present here.questions on azure cyclecloud, no.of vnet/vms required for implimentation,blueprints assignment/management group etc
practice test
want the dumps for emc content management server programming(cmsp)
brilliant and helpful
q75. azure files is pass
very helpful
thank you for these questions. it helped a lot.
how do i get the h12-724 dumps
nice data dumps
answers are correct
good explanation