Which of the following vulnerability assessment software can check for weak passwords on the network?

  1. Password cracker
  2. Antivirus software
  3. Anti-spyware software
  4. Wireshark

Answer(s): A

Explanation:

A password cracker is an application program that is used to identify an unknown or forgotten password on a computer or network resources. It can also be used to help a human cracker obtain unauthorized access to resources. A password cracker can also check for weak passwords on the network and give notifications to put another password.

Incorrect Answers:
B: Antivirus or anti-virus software is used to prevent, detect, and remove malware. It scans the computer for viruses.

C: Anti-spyware software is a type of program designed to prevent and detect unwanted spyware program installations and to remove those programs if installed.

D: Wireshark is a free and open-source protocol analyzer. It is used for network troubleshooting, analysis, software and communications protocol development, and education.



Which of the following is NOT true for risk governance?

  1. Risk governance is based on the principles of cooperation, participation, mitigation and sustainability, and is adopted to achieve more effective risk management.
  2. Risk governance requires reporting once a year.
  3. Risk governance seeks to reduce risk exposure and vulnerability by filling gaps in risk policy.
  4. Risk governance is a systemic approach to decision making processes associated to natural and technological risks.

Answer(s): B

Explanation:

Risk governance is a continuous life cycle that requires regular reporting and ongoing review, not once a year. Incorrect Answers:
A, C, D: These are true for risk governance.



You are the project manager of HGT project. You have identified project risks and applied appropriate response for its mitigation. You noticed a risk generated as a result of applying response. What this resulting risk is known as?

  1. Pure risk
  2. Secondary risk
  3. Response risk
  4. High risk

Answer(s): B

Explanation:

Secondary risk is a risk that is generated as the result of risk response. Incorrect Answers:
A: A pure risk is a risk that has only a negative effect on the project. Pure risks are activities that are dangerous to complete and manage such as construction, electrical work, or manufacturing.

C, D: These terms are not applied for the risk that is generated as a result of risk response.



What are the various outputs of risk response?

  1. Risk Priority Number
  2. Residual risk
  3. Risk register updates
  4. Project management plan and Project document updates
  5. Risk-related contract decisions

Answer(s): C,D,E

Explanation:

The outputs of the risk response planning process are:
Risk Register Updates: The risk register is written in detail so that it can be related to the priority ranking and the planned response.
Risk Related Contract Decisions: Risk related contract decisions are the decisions to transmit risk, such as services, agreements for insurance, and other items as required. It provides a means for sharing risks.
Project Management Plan Updates: Some of the elements of the project management plan updates are:
- Schedule management plan
- Cost management plan
- Quality management plan
- Procurement management plan
- Human resource management plan
- Work breakdown structure
- Schedule baseline
- Cost performance baseline

Project Document Updates: Some of the project documents that can be updated includes:
- Assumption log updates
- Technical documentation updates

Incorrect Answers:
A: Risk priority number is not an output for risk response but instead it is done before applying response. Hence it acts as one of the inputs of risk response and is not the output of it.

B: Residual risk is not an output of risk response. Residual risk is the risk that remains after applying controls. It is not feasible to eliminate all risks from an organization. Instead, measures can be taken to reduce risk to an acceptable level. The risk that is left is residual risk. As,
Risk = Threat Vulnerability and
Total risk = Threat Vulnerability Asset Value

Residual risk can be calculated with the following formula:
Residual Risk = Total Risk - Controls

Senior management is responsible for any losses due to residual risk. They decide whether a risk should be avoided, transferred, mitigated or accepted. They also decide what controls to implement. Any loss due to their decisions falls on their sides.

Residual risk assessments are conducted after mitigation to determine the impact of the risk on the enterprise. For risk assessment, the effect and frequency is reassessed and the impact is recalculated.



Which of the following is an output of risk assessment process?

  1. Identification of risk
  2. Identification of appropriate controls
  3. Mitigated risk
  4. Enterprise left with residual risk

Answer(s): B

Explanation:

The output of the risk assessment process is identification of appropriate controls for reducing or eliminating risk during the risk mitigation process. To determine the likelihood of a future adverse event, threats to an IT system must be analyzed in conjunction with the potential vulnerabilities and the controls in place for the IT system.

Once risk factors have been identified, existing or new controls are designed and measured for their strength and likelihood of effectiveness. Controls are preventive, detective or corrective; manual or programmed; and formal or ad hoc.

Incorrect Answers:
A: Risk identification acts as input of the risk assessment process.

C: This is an output of risk mitigation process, that is, after applying several risk responses. D: Residual risk is the latter output after appropriate control.



Viewing Page 29 of 361



Share your comments for ISACA CRISC exam with other users:

Ahmed Hashi 7/6/2023 5:40:00 PM

thanks ly so i have information cia
EUROPEAN UNION


mansi 5/31/2023 7:58:00 AM

hello team, i need sap qm dumps for practice
INDIA


Jamil aljamil 12/4/2023 4:47:00 AM

it’s good but not senatios based
UNITED KINGDOM


Cath 10/10/2023 10:19:00 AM

q.119 - the correct answer is b - they are not captured in an update set as theyre data.
VIET NAM


P 1/6/2024 11:22:00 AM

good matter
Anonymous


surya 7/30/2023 2:02:00 PM

please upload c_sacp_2308
CANADA


Sasuke 7/11/2023 10:30:00 PM

please upload the dump. thanks very much !!
Anonymous


V 7/4/2023 8:57:00 AM

good questions
UNITED STATES


TTB 8/22/2023 5:30:00 AM

hi, could you please update the latest dump version
Anonymous


T 7/28/2023 9:06:00 PM

this question is keep repeat : you are developing a sales application that will contain several azure cloud services and handle different components of a transaction. different cloud services will process customer orders, billing, payment, inventory, and shipping. you need to recommend a solution to enable the cloud services to asynchronously communicate transaction information by using xml messages. what should you include in the recommendation?
NEW ZEALAND


Gurgaon 9/28/2023 4:35:00 AM

great questions
UNITED STATES


wasif 10/11/2023 2:22:00 AM

its realy good
UNITED ARAB EMIRATES


Shubhra Rathi 8/26/2023 1:12:00 PM

oracle 1z0-1059-22 dumps
Anonymous


Leo 7/29/2023 8:48:00 AM

please share me the pdf..
INDIA


AbedRabbou Alaqabna 12/18/2023 3:10:00 AM

q50: which two functions can be used by an end user when pivoting an interactive report? the correct answer is a, c because we do not have rank in the function pivoting you can check in the apex app
GREECE


Rohan Limaye 12/30/2023 8:52:00 AM

best to practice
Anonymous


Aparajeeta 10/13/2023 2:42:00 PM

so far it is good
Anonymous


Vgf 7/20/2023 3:59:00 PM

please provide me the dump
Anonymous


Deno 10/25/2023 1:14:00 AM

i failed the cisa exam today. but i have found all the questions that were on the exam to be on this site.
Anonymous


CiscoStudent 11/15/2023 5:29:00 AM

in question 272 the right answer states that an autonomous acces point is "configured and managed by the wlc" but this is not what i have learned in my ccna course. is this a mistake? i understand that lightweight aps are managed by wlc while autonomous work as standalones on the wlan.
Anonymous


pankaj 9/28/2023 4:36:00 AM

it was helpful
Anonymous


User123 10/8/2023 9:59:00 AM

good question
UNITED STATES


vinay 9/4/2023 10:23:00 AM

really nice
Anonymous


Usman 8/28/2023 10:07:00 AM

please i need dumps for isc2 cybersecuity
Anonymous


Q44 7/30/2023 11:50:00 AM

ans is coldline i think
UNITED STATES


Anuj 12/21/2023 1:30:00 PM

very helpful
Anonymous


Giri 9/13/2023 10:31:00 PM

can you please provide dumps so that it helps me more
UNITED STATES


Aaron 2/8/2023 12:10:00 AM

thank you for providing me with the updated question and answers. this version has all the questions from the exam. i just saw them in my exam this morning. i passed my exam today.
SOUTH AFRICA


Sarwar 12/21/2023 4:54:00 PM

how i can see exam questions?
CANADA


Chengchaone 9/11/2023 10:22:00 AM

can you please upload please?
Anonymous


Mouli 9/2/2023 7:02:00 AM

question 75: option c is correct answer
Anonymous


JugHead 9/27/2023 2:40:00 PM

please add this exam
Anonymous


sushant 6/28/2023 4:38:00 AM

please upoad
EUROPEAN UNION


John 8/7/2023 12:09:00 AM

has anyone recently attended safe 6.0 certification? is it the samq question from here.
Anonymous