One way to determine control effectiveness is by determining:
Answer(s): C
Control effectiveness requires a process to verify that the control process worked as intended. Examples such as dual-control or dual-entry bookkeeping provide verification and assurance that the process operated as intended. The type of control is not relevant, and notification of failure is not determinative of control strength. Reliability is not an indication of control strength; weak controls can be highly reliable, even if they are ineffective controls.
What does a network vulnerability assessment intend to identify?
Answer(s): D
A network vulnerability assessment intends to identify known vulnerabilities based on common misconfigurations and missing updates. 0-day vulnerabilities by definition are not previously known and therefore are undetectable. Malicious software and spyware are normally addressed through antivirus and antispyware policies. Security design flaws require a deeper level of analysis.
Who is responsible for ensuring that information is classified?
The data owner is responsible for applying the proper classification to the data. Senior management is ultimately responsible for the organization. The security officer is responsible for applying security protection relative to the level of classification specified by the owner. The technology group is delegated the custody of the data by the data owner, but the group does not classify the information.
After a risk assessment, it is determined that the cost to mitigate the risk is much greater than the benefit to be derived. The information security manager should recommend to business management that the risk be:
When the cost of control is more than the cost of the risk, the risk should be accepted. Transferring, treating or terminating the risk is of limited benefit if the cost of that control is more than the cost of the risk itself.
When a significant security breach occurs, what should be reported FIRST to senior management?
Answer(s): B
When reporting an incident to senior management, the initial information to be communicated should include an of what happened and how the breach was resolved. A summary of security logs would be too technical to report to senior management. An analysis of the impact of similar attacks and a business case for improving controls would be desirable; however, these would be communicated later in the process.
Share your comments for ISACA CISM exam with other users:
@aarun , thanks for the information. it would be great help if you share your email
1z0-1078-23 need this dumps
i gave the microsoft azure az-500 tests and prepared from this site as it has latest mock tests available which helped me evaluate my performance and score 919/1000
i cannot see the button to go to the questions
good questions
q-6 ans-b correct. https://docs.paloaltonetworks.com/pan-os/9-1/pan-os-cli-quick-start/use-the-cli/commit-configuration-changes
very nice very nice
please help us with 1z0-1107-2 dumps
please upload the practice questions
need this dumps
preparing for this exam is overwhelming. you cannot pass without the help of these exam dumps.
new to this site but i feel it is good
the correct answer to q8 is b. explanation since the mule app has a dependency, it is necessary to include project modules and dependencies to make sure the app will run successfully on the runtime on any other machine. source code of the component that the mule app is dependent of does not need to be included in the exported jar file, because the source code is not being used while executing an app. compiled code is being used instead.
Delayed the exam until December 29th.
A and D are True
good one with explanation
This is one of the most useful study guides I have ever used.